Section 1
Installation and concreting of the 1st floor has begun.

Section 2
Installation of the floor slab of the 4th floor is completed.
Laying of the outer walls of the 2nd floor has begun.

Section 3
The construction of vertical elements of the 3rd floor is completed.
Installation of the floor slab of the 3rd floor has begun.