<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	 xmlns:media="http://search.yahoo.com/mrss/" >

<channel>
	<title>News Archive - blago – we create apartments that are comfortable for living!</title>
	<atom:link href="https://blagodeveloper.com/en/news/feed/" rel="self" type="application/rss+xml" />
	<link>https://blagodeveloper.com/en/news/</link>
	<description></description>
	<lastBuildDate>Tue, 05 Aug 2025 09:49:02 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://blagodeveloper.com/wp-content/uploads/2024/12/favicon.png</url>
	<title>News Archive - blago – we create apartments that are comfortable for living!</title>
	<link>https://blagodeveloper.com/en/news/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Franko River Club cottage community &#124; 20.11.2023</title>
		<link>https://blagodeveloper.com/en/news/updated-photos-of-the-parus-residential-complex-as-of-19-12-2023/</link>
		
		<dc:creator><![CDATA[blago]]></dc:creator>
		<pubDate>Tue, 19 Dec 2023 14:39:03 +0000</pubDate>
				<guid isPermaLink="false">https://api.blagodeveloper.com/news/updated-photos-of-the-parus-residential-complex-as-of-19-12-2023/</guid>

					<description><![CDATA[<p>Franko River Club is a cottage community where each house has its own personal style, without disturbing the holistic perception of the whole complex &#8211; cosy, harmonious, special. Sophistication is felt in everything: the layout of the facade, interior, and landscape. It combines comfort with luxury, practicality with a dream. Advantages of Franko River Club: [&#8230;]</p>
<p>Запис <a href="https://blagodeveloper.com/en/news/updated-photos-of-the-parus-residential-complex-as-of-19-12-2023/">Franko River Club cottage community | 20.11.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Franko River Club is a cottage community where each house has its own personal style, without disturbing the holistic perception of the whole complex &ndash; cosy, harmonious, special. Sophistication is felt in everything: the layout of the facade, interior, and landscape. It combines comfort with luxury, practicality with a dream.<br>
Advantages of Franko River Club:<br>
&ndash; The town is located in an ecological part of the city near the river.<br>
&ndash; A special style of &ldquo;organic architecture&rdquo; by architect Wright Lloyd.<br>
&ndash; Individual design of each house.<br>
&ndash; Children&rsquo;s and sports grounds, indoor swimming pool, spa area, gym.<br>
&ndash; Maximum energy efficiency and functionality.<br>
&ndash; Elegant landscape design.<br>
&ndash; Cosy river embankment nearby.<br>
&ndash; Video surveillance system, round-the-clock security.<br>
&ndash; Developed infrastructure.</p>
<p>Запис <a href="https://blagodeveloper.com/en/news/updated-photos-of-the-parus-residential-complex-as-of-19-12-2023/">Franko River Club cottage community | 20.11.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></content:encoded>
					
		
		
		
	</item>
		<item>
		<title>Construction state of the residential complex &#8220;SKYGARDEN&#8221; as of 18.12.2023</title>
		<link>https://blagodeveloper.com/en/news/construction-state-of-the-residential-complex-skygarden-as-of-18-12-2023/</link>
		
		<dc:creator><![CDATA[blago]]></dc:creator>
		<pubDate>Mon, 18 Dec 2023 08:29:41 +0000</pubDate>
				<guid isPermaLink="false">https://api.blagodeveloper.com/news/construction-state-of-the-residential-complex-skygarden-as-of-18-12-2023/</guid>

					<description><![CDATA[<p>Section 1 Installation of vertical elements of the 4th residential floor is completed.Section 2 Reinforcement of the floor slab of the 3rd residential floor is completed.Section 3 Installation of vertical elements of the 1st residential floor is completed. Installation of the floor slab of the 1st residential floor is completed.Section 4 Installation of formwork for [&#8230;]</p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-state-of-the-residential-complex-skygarden-as-of-18-12-2023/">Construction state of the residential complex &#8220;SKYGARDEN&#8221; as of 18.12.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Section 1</strong><br>
Installation of vertical elements of the 4th residential floor is completed.<p><strong>Section 2</strong><br>
Reinforcement of the floor slab of the 3rd residential floor is completed.</p><p><strong>Section 3</strong><br>
Installation of vertical elements of the 1st residential floor is completed.<br>
Installation of the floor slab of the 1st residential floor is completed.</p><p><strong>Section 4</strong><br>
Installation of formwork for the floor slab of the 0th floor has begun.</p><p><strong>Section 5</strong><br>
Installation of foundation grillage is completed.<br>
Concreting of vertical elements of the 0th floor has been completed.</p><p><strong>Section 6</strong><br>
Installation of the pile field is in progress.</p></p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-state-of-the-residential-complex-skygarden-as-of-18-12-2023/">Construction state of the residential complex &#8220;SKYGARDEN&#8221; as of 18.12.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></content:encoded>
					
		
		
		
	</item>
		<item>
		<title>Construction state of the residential complex &#8220;IQ House&#8221; as of 06.12.2023</title>
		<link>https://blagodeveloper.com/en/news/construction-state-of-the-residential-complex-iq-house-as-of-06-12-2023/</link>
		
		<dc:creator><![CDATA[blago]]></dc:creator>
		<pubDate>Wed, 06 Dec 2023 15:16:58 +0000</pubDate>
				<guid isPermaLink="false">https://api.blagodeveloper.com/news/construction-state-of-the-residential-complex-iq-house-as-of-06-12-2023/</guid>

					<description><![CDATA[<p>Section 1 Work on waterproofing the foundation has been completed. The laying of the parapet has begun. Installation of window structures is 70% complete.Section 2 The roof has been completed. Works on the facade have been completed by 60%. Works on waterproofing of the foundation have been completed. Plastering works in this section are completed. [&#8230;]</p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-state-of-the-residential-complex-iq-house-as-of-06-12-2023/">Construction state of the residential complex &#8220;IQ House&#8221; as of 06.12.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Section 1</strong><br>
Work on waterproofing the foundation has been completed.<br>
The laying of the parapet has begun.<br>
Installation of window structures is 70% complete.<p><strong>Section 2</strong><br>
The roof has been completed.<br>
Works on the facade have been completed by 60%.<br>
Works on waterproofing of the foundation have been completed.<br>
Plastering works in this section are completed.<br>
Installation of the lift is 70% complete.<br>
Installation of window structures is 70% complete.</p><p><strong>Section 3</strong><br>
Plastering of the walls from the 5th to the 7th floor has been completed.<br>
Works on waterproofing the foundation have been completed.<br>
The masonry of the interior and inter-apartment walls of the 8th, 9th and 10th floors is in progress.<br>
Installation of roof insulation has begun.<br>
The facade has been completed by 30%.<br>
Installation of window structures is 70% complete.</p></p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-state-of-the-residential-complex-iq-house-as-of-06-12-2023/">Construction state of the residential complex &#8220;IQ House&#8221; as of 06.12.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></content:encoded>
					
		
		
		
	</item>
		<item>
		<title>Construction state of the residential complex &#8220;MAIN HOUSE&#8221; as of 05.12.2023</title>
		<link>https://blagodeveloper.com/en/news/construction-state-of-the-residential-complex-main-house-as-of-12-05-2023/</link>
		
		<dc:creator><![CDATA[blago]]></dc:creator>
		<pubDate>Tue, 05 Dec 2023 14:37:47 +0000</pubDate>
				<guid isPermaLink="false">https://api.blagodeveloper.com/news/construction-state-of-the-residential-complex-main-house-as-of-12-05-2023/</guid>

					<description><![CDATA[<p>Section 1 Facade works on the commercial floor are 80% complete.Section 2 Installation of a hinged-ventilated facade is completed.Car park Finishing of the car park is 60% complete Installation of engineering networks has begun.Landscaping Landscaping is 90% complete. Fencing is completed.</p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-state-of-the-residential-complex-main-house-as-of-12-05-2023/">Construction state of the residential complex &#8220;MAIN HOUSE&#8221; as of 05.12.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Section 1</strong><br>
Facade works on the commercial floor are 80% complete.<p><strong>Section 2</strong><br>
Installation of a hinged-ventilated facade is completed.</p><p><strong>Car park</strong><br>
Finishing of the car park is 60% complete<br>
Installation of engineering networks has begun.</p><p><strong>Landscaping</strong><br>
Landscaping is 90% complete.<br>
Fencing is completed.</p></p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-state-of-the-residential-complex-main-house-as-of-12-05-2023/">Construction state of the residential complex &#8220;MAIN HOUSE&#8221; as of 05.12.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></content:encoded>
					
		
		
		
	</item>
		<item>
		<title>Construction status of the U ONE residential complex as of 04.12.2023</title>
		<link>https://blagodeveloper.com/en/news/construction-status-of-the-u-one-residential-complex-as-of-04-12-2023/</link>
		
		<dc:creator><![CDATA[blago]]></dc:creator>
		<pubDate>Mon, 04 Dec 2023 14:58:05 +0000</pubDate>
				<guid isPermaLink="false">https://api.blagodeveloper.com/news/construction-status-of-the-u-one-residential-complex-as-of-04-12-2023/</guid>

					<description><![CDATA[<p>Section 3 The masonry of the internal walls of the 12th floor is completed. Plastering of apartments on the 12th floor is in progress. The roof is 98% complete. Facade works have been completed by 25%. Installation of air conditioning baskets is in progress. Installation of internal power supply networks is completed. Section 4 Glazing [&#8230;]</p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-status-of-the-u-one-residential-complex-as-of-04-12-2023/">Construction status of the U ONE residential complex as of 04.12.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Section 3</strong><br>
The masonry of the internal walls of the 12th floor is completed.<br>
Plastering of apartments on the 12th floor is in progress.<br>
The roof is 98% complete.<br>
Facade works have been completed by 25%.<br>
Installation of air conditioning baskets is in progress.<br>
Installation of internal power supply networks is completed.<br>
<strong>Section 4</strong><br>
Glazing of the 10th, 11th and 12th floors is 70% complete.<br>
Plastering of staircases is 88% complete.<br>
Installation of a sloping semi-dry roof screed has been completed.<br>
Roof insulation has been completed.<br>
The installation of roll waterproofing of the roof is 50% complete.<br>
<strong>Section 2</strong><br>
Reinforcement of the vertical elements of the 12th floor has been completed.<br>
Concreting of the vertical elements of the 12th floor has been completed.<br>
Installation of the floor slab of the 12th floor completed.<br>
Installation of vertical elements of the technical floor completed.<br>
Installation of the floor slab of the technical floor is completed.<br>
Completed laying of the outer walls of the 1st floor.<br>
Laying of the outer walls of the 2nd and 3rd floors has begun.<br>
<strong>Section 1</strong><br>
Installation of vertical elements of the 4th floor completed.<br>
Installation of the floor slab of the 4th floor has been completed.<br>
Works on the installation of external water supply and sewage networks are in progress.</p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-status-of-the-u-one-residential-complex-as-of-04-12-2023/">Construction status of the U ONE residential complex as of 04.12.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></content:encoded>
					
		
		
		
	</item>
		<item>
		<title>We announce the start of construction of the new section &#8220;SKYGARDEN&#8221;</title>
		<link>https://blagodeveloper.com/en/news/we-announce-the-start-of-construction-of-the-new-section-skygarden/</link>
		
		<dc:creator><![CDATA[blago]]></dc:creator>
		<pubDate>Fri, 01 Dec 2023 07:30:56 +0000</pubDate>
				<guid isPermaLink="false">https://api.blagodeveloper.com/news/we-announce-the-start-of-construction-of-the-new-section-skygarden/</guid>

					<description><![CDATA[<p>We are pleased to announce that our new large-scale project is getting even bigger. This week we started construction of the next &#8211; the sixth section. Therefore, we are announcing the start of apartment sales at the best prices&#65039;.Choose a layout from 39 to 67 m2 on any floor.But don&#8217;t think too long &#8211; the [&#8230;]</p>
<p>Запис <a href="https://blagodeveloper.com/en/news/we-announce-the-start-of-construction-of-the-new-section-skygarden/">We announce the start of construction of the new section &#8220;SKYGARDEN&#8221;</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>We are pleased to announce that our new large-scale project is getting even bigger. This week we started construction of the next &ndash; the sixth section. Therefore, we are announcing the start of apartment sales at the best prices&#65039;.<p>Choose a layout from 39 to 67 m2 on any floor.</p><p>But don&rsquo;t think too long &ndash; the number of view apartments is limited.</p><p>Contact blago managers and buy your ideal apartment:</p><p>+38 (067) 761-28-35</p></p>
<p>Запис <a href="https://blagodeveloper.com/en/news/we-announce-the-start-of-construction-of-the-new-section-skygarden/">We announce the start of construction of the new section &#8220;SKYGARDEN&#8221;</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></content:encoded>
					
		
		
		
	</item>
		<item>
		<title>Dynamics of construction of the Parkova Alley residential complex: April-November 2023</title>
		<link>https://blagodeveloper.com/en/news/dynamics-of-construction-of-the-parkova-alley-residential-complex-april-november-2023/</link>
		
		<dc:creator><![CDATA[blago]]></dc:creator>
		<pubDate>Fri, 01 Dec 2023 07:20:59 +0000</pubDate>
				<guid isPermaLink="false">https://api.blagodeveloper.com/news/dynamics-of-construction-of-the-parkova-alley-residential-complex-april-november-2023/</guid>

					<description><![CDATA[<p>We continue to pave the way for the future with a high-tech and innovative approach to construction. Our team does not rest on its laurels and continues to create a comfortable living space.&#160;Section 3Installation of internal electrical networks has been completed.Works on the installation of internal water supply and sewage networks have been completed.The industrial [&#8230;]</p>
<p>Запис <a href="https://blagodeveloper.com/en/news/dynamics-of-construction-of-the-parkova-alley-residential-complex-april-november-2023/">Dynamics of construction of the Parkova Alley residential complex: April-November 2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>We continue to pave the way for the future with a high-tech and innovative approach to construction. Our team does not rest on its laurels and continues to create a comfortable living space.<p>&nbsp;</p><p><strong>Section 3</strong></p><p>Installation of internal electrical networks has been completed.</p><p>Works on the installation of internal water supply and sewage networks have been completed.</p><p>The industrial floor has been installed.</p><p>Facade works have been completed.</p><p>Installation of the lift has been completed.</p><p>Installation of doors has been completed.</p><p>Connection of gas communications to the apartments has been completed.</p><p>Concreting of the concrete screed of the basement storerooms has been completed.</p><p>The laying of the basement storerooms has begun.</p><p>The masonry of the external and internal walls of the commercial premises has been completed.</p><p>The paving of the commercial area has begun.</p><p>&nbsp;</p><p><strong>Section 3a</strong></p><p>The roof has been installed.</p><p>Installation of internal electrical networks has been completed.</p><p>Works on the installation of internal water supply and sewage networks have been completed.</p><p>The facade has been completed.</p><p>Interior finishing works are 90% complete.</p><p>Concreting of the concrete screed of the basement storerooms was completed.</p><p>The masonry of the external and internal walls of the commercial premises has been completed.</p><p>Installation of doors has been completed.</p><p>Installation of the lift has been completed.</p><p>Connection of gas communications to the apartments is in progress.</p><p>The water metering unit has been connected.</p><p>Installation of the electrical switchboard has begun.</p><p>The paving of the pavement near the commercial area has begun.</p><p>&nbsp;</p><p><strong>Section 3b</strong></p><p>The 4th-11th floors have been erected.</p><p>Installation of vertical elements of the technical floor has begun.</p><p>Laying of the internal walls of the 2nd-4th floors has been completed.</p><p>Laying of the external walls of the 2nd-7th floors has been completed.</p><p>Laying of the external walls of the 8th floor has begun.</p><p>Glazing of the 2nd-6th floors has been completed.</p><p>&nbsp;</p><p><strong>Section 3c</strong></p><p>All monolithic works are completed.</p><p>Glazing of the 1st-7th floors has been completed.</p><p>Laying of the internal walls of the 2nd-4th floors has been completed.</p><p>Laying of the external walls of the 2nd-7th floors has been completed.</p><p>Laying of the outer walls of the 8th floor has begun.</p><p>Completed laying of the parapet and ventilation chimneys.</p><p>Completion of the technical floor.</p><p>Installation of a sloping semi-dry roof screed has begun.</p><p>Concreting of the concrete screed of the basement storerooms is completed.</p><p>&nbsp;</p><p><strong>Section 3g</strong></p><p>The excavation of the pit has been completed.</p><p>Concreting of the foundation slab was completed.</p><p>Installation of the vertical elements of the basement floor has been completed.</p><p>Installation of the basement floor slab.</p><p>The 1st floor was erected.</p><p>Installation of vertical elements of the 2nd floor has begun.</p><p>&nbsp;</p><p><strong>Section 3D</strong></p><p>The foundation slab has been installed.</p><p>The 1st-4th floors have been erected.</p><p>Installation of vertical elements of the 5th floor has begun.</p><p>Concreting of the concrete screed of the basement storerooms has been completed.</p><p>&nbsp;</p><p><strong>Section 3e</strong></p><p>The excavation of the pit has been completed.</p><p>The foundation slab has been installed.</p><p>Installation of the vertical elements of the basement floor was completed.</p><p>Installation of formwork for the basement floor slab.</p><p>Installation of the basement floor slab.</p><p>Installation of vertical elements of the 1st floor has been completed.</p><p>Installation of the floor slab of the 1st floor has begun.</p><p>&nbsp;</p><p><strong>Sections 4-5</strong></p><p>Transferred to the management company.</p><p>&nbsp;</p><p><strong>Sections 6-7</strong></p><p>Paving stones have been laid.</p><p>Landscaping has been completed.</p></p>
<p>Запис <a href="https://blagodeveloper.com/en/news/dynamics-of-construction-of-the-parkova-alley-residential-complex-april-november-2023/">Dynamics of construction of the Parkova Alley residential complex: April-November 2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></content:encoded>
					
		
		
		
	</item>
		<item>
		<title>Construction state of the residential complex &#8220;SKYGARDEN&#8221; as of 29.11.2023</title>
		<link>https://blagodeveloper.com/en/news/construction-state-of-the-residential-complex-skygarden-as-of-29-11-2023/</link>
		
		<dc:creator><![CDATA[blago]]></dc:creator>
		<pubDate>Wed, 29 Nov 2023 07:35:15 +0000</pubDate>
				<guid isPermaLink="false">https://api.blagodeveloper.com/news/construction-state-of-the-residential-complex-skygarden-as-of-29-11-2023/</guid>

					<description><![CDATA[<p>Section 1 Concreting of the floor slab of the 2nd floor has been completed. Installation of vertical elements of the 3rd floor is completed. Installation of the floor slab of the 3rd floor is completed. Reinforcement of vertical elements of the 4th floor is completed. Concreting of vertical elements of the 4th floor is in [&#8230;]</p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-state-of-the-residential-complex-skygarden-as-of-29-11-2023/">Construction state of the residential complex &#8220;SKYGARDEN&#8221; as of 29.11.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Section 1</strong><br>
Concreting of the floor slab of the 2nd floor has been completed.<br>
Installation of vertical elements of the 3rd floor is completed.<br>
Installation of the floor slab of the 3rd floor is completed.<br>
Reinforcement of vertical elements of the 4th floor is completed.<br>
Concreting of vertical elements of the 4th floor is in progress.<p><strong>Section 2</strong><br>
Installation of formwork for the floor slab of the 2nd floor is completed.<br>
Installation of the floor slab of the 2nd floor is completed.<br>
Installation of vertical elements of the 3rd floor is completed.<br>
Reinforcement of the floor slab on the 3rd floor has begun.</p><p><strong>Section 3</strong><br>
Installation of formwork for the floor slab of the 1st floor is completed.<br>
Installation of the floor slab on the 1st floor is completed.<br>
Installation of vertical elements of the 2nd floor is in progress.</p><p><strong>Section 4</strong><br>
Reinforcement of the vertical elements of the 0th floor has been completed.<br>
Concreting of vertical elements of the 0th floor has begun.</p><p><strong>Section 5</strong><br>
Installation of foundation grillage is 20% complete.</p><p><strong>Section 6</strong><br>
Installation of the pile field has begun.</p></p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-state-of-the-residential-complex-skygarden-as-of-29-11-2023/">Construction state of the residential complex &#8220;SKYGARDEN&#8221; as of 29.11.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></content:encoded>
					
		
		
		
	</item>
		<item>
		<title>Construction state of the Union residential complex as of 28.11.2023</title>
		<link>https://blagodeveloper.com/en/news/construction-state-of-the-union-residential-complex-as-of-28-11-2023/</link>
		
		<dc:creator><![CDATA[blago]]></dc:creator>
		<pubDate>Tue, 28 Nov 2023 07:14:54 +0000</pubDate>
				<guid isPermaLink="false">https://api.blagodeveloper.com/news/construction-state-of-the-union-residential-complex-as-of-28-11-2023/</guid>

					<description><![CDATA[<p>Section B The hall is 90% finished.Section C The hall is 90% finished.Section D Laying of the internal walls of the 5th, 6th and 7th floors has begun. The glazing of the 10th floor has been completed. Facade works are in progress. Plastering of apartment walls and staircases has begun.Section E The masonry of the [&#8230;]</p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-state-of-the-union-residential-complex-as-of-28-11-2023/">Construction state of the Union residential complex as of 28.11.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Section B</strong><br>
The hall is 90% finished.<p><strong>Section C</strong><br>
The hall is 90% finished.</p><p><strong>Section D</strong><br>
Laying of the internal walls of the 5th, 6th and 7th floors has begun.<br>
The glazing of the 10th floor has been completed.<br>
Facade works are in progress.<br>
Plastering of apartment walls and staircases has begun.</p><p><strong>Section E</strong><br>
The masonry of the external walls of the 10th floor has been completed.<br>
Laying of the internal walls of the 3rd floor is in progress.<br>
Glazing of the 5th floor is completed.<br>
Glazing of the 6th floor has begun.</p><p><strong>Commercial</strong><br>
Completed construction of the commercial facade.<br>
Landscaping is in progress.</p></p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-state-of-the-union-residential-complex-as-of-28-11-2023/">Construction state of the Union residential complex as of 28.11.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></content:encoded>
					
		
		
		
	</item>
		<item>
		<title>Construction state of the Parkova Alley residential complex as of 27.11.2023</title>
		<link>https://blagodeveloper.com/en/news/construction-state-of-the-parkova-alley-residential-complex-as-of-27-11-2023/</link>
		
		<dc:creator><![CDATA[blago]]></dc:creator>
		<pubDate>Mon, 27 Nov 2023 15:37:52 +0000</pubDate>
				<guid isPermaLink="false">https://api.blagodeveloper.com/news/construction-state-of-the-parkova-alley-residential-complex-as-of-27-11-2023/</guid>

					<description><![CDATA[<p>Section 3 Installation of doors has been completed. Gas supply to the apartments is in progress. Concreting of the concrete screed of the basement storerooms is completed.Section 3a Interior finishing works are 90% complete. Installation of the lift has been completed. Installation of doors has been completed. Gas supply to the apartments is in progress. [&#8230;]</p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-state-of-the-parkova-alley-residential-complex-as-of-27-11-2023/">Construction state of the Parkova Alley residential complex as of 27.11.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Section 3<br>
Installation of doors has been completed.<br>
Gas supply to the apartments is in progress.<br>
Concreting of the concrete screed of the basement storerooms is completed.<p><strong>Section 3a</strong><br>
Interior finishing works are 90% complete.<br>
Installation of the lift has been completed.<br>
Installation of doors has been completed.<br>
Gas supply to the apartments is in progress.<br>
Connection of the water metering unit is completed.<br>
Installation of the electrical switchboard has begun.<br>
Concreting of the concrete screed of the basement storerooms is completed.</p><p><strong>Section 3b</strong><br>
Concreting of vertical elements of the 10th floor is completed.<br>
Installation of vertical elements of the 11th floor is complete.<br>
Installation of the floor slab of the 11th floor is completed.<br>
Installation of vertical elements of the technical floor has begun.<br>
Completion of the internal walls of the 4th floor.<br>
Completed laying of the exterior walls of the 7th floor.<br>
Laying of the external walls of the 8th floor has begun.<br>
Glazing of the 5th and 6th floors is completed.</p><p><strong>Section 3c</strong><br>
All monolithic works are completed.<br>
Laying of the outer walls of the 7th floor has been completed.<br>
Laying of the external walls of the 8th floor has begun.<br>
Laying of the internal walls of the 4th floor is completed.<br>
Glazing of the 7th floor is completed.<br>
Completion of the parapet and ventilation chimneys.<br>
Completion of the technical floor.<br>
Installation of a sloping semi-dry roof screed has begun.<br>
Concreting of the concrete screed of the basement storerooms is completed.</p><p><strong>Section 3D</strong><br>
Concreting of the foundation slab has been completed.<br>
Installation of vertical elements of the basement floor is completed.<br>
Installation of the basement floor slab is completed.<br>
Installation of vertical elements of the 1st floor is completed.<br>
Installation of the floor slab of the 1st floor is completed.<br>
Installation of vertical elements of the 2nd floor has begun.</p><p><strong>Section 3E</strong><br>
Concreting of vertical elements of the 3rd floor is completed.<br>
Installation of the floor slab of the 3rd floor is completed.<br>
Installation of vertical elements of the 4th floor is completed.<br>
Installation of the floor slab of the 4th floor is completed.<br>
Installation of vertical elements of the 5th floor has begun.<br>
Concreting of the concrete screed of the basement storerooms is completed.</p><p><strong>Section 3F</strong><br>
Installation of vertical elements of the basement floor is completed.<br>
Installation of formwork for the basement floor slab is completed.<br>
Installation of the basement floor slab is completed.<br>
Installation of vertical elements of the 1st floor is completed.<br>
Installation of the floor slab of the 1st floor has begun.</p><p><strong>Commerce</strong><br>
Paving in sections 3 and 3a has begun.</p></p>
<p>Запис <a href="https://blagodeveloper.com/en/news/construction-state-of-the-parkova-alley-residential-complex-as-of-27-11-2023/">Construction state of the Parkova Alley residential complex as of 27.11.2023</a> спершу з'явиться на <a href="https://blagodeveloper.com/en">blago – we create apartments that are comfortable for living!</a>.</p>
]]></content:encoded>
					
		
		
		
	</item>
	</channel>
</rss>
